Skip to content
Dynamic Construction
Project / 04
HIGH-RISE
JOHANNESBURG / GAUTENG

High-Rise Residential

Location
Johannesburg, Gauteng
Sector
High-Rise
Project Type
High-Rise Construction
Status
In progress
High-rise residential tower under construction in Johannesburg with exposed concrete floor slabs

The Brief

A multi-level residential building requiring a repeated structural cycle, tight vertical logistics and consistent quality from lower floors through to the upper levels.

Our Role

Structural frame, formwork and reinforcement cycles, vertical transport, envelope installation and internal finishing coordination.

The Build

A repeating floor cycle was established early and refined as the building rose. Setting out was verified at every level, and material handling was coordinated around a constrained site footprint.

Result

Construction continues on programme, with completed levels progressively released to finishing trades.

Gallery
Concrete slabs and scaffolding on the rising tower
HIGH-RISE / 01
Concrete surface detail on the structure
HIGH-RISE / 02
Completed contemporary structure at dusk
HIGH-RISE / 03
Next
Commercial / 006

Planning something big?

Dynamic Construction works with property developers, businesses, institutions, architects and project teams on construction projects requiring disciplined delivery and professional coordination.